Sunday, 27 February 2011

Risk Assessment For The Film Shoot

Friday The 10th of December:
Due to a few important factors, we could not film the entire footage on the 10th of december. So we altered our risk assessment to ensure that we did not falter a second time.
The first shoot, we fogot a few vital props and could only film the first 10-15 seconds of the trailer.
The battery almost nearly died too, which would have disrupted the shooting anyway.
Safety...
Moving any water bottles and keeping food away from the electrical equipment.
Making sure no bags or shoes are on set for shooting to ensure that nobody could trip up and potentially injure themselves.
Filiming...
Keeping enough battery life on the camera for shooting.
Enough space on the tape for filming.
Making sure that when beginning the shoot, the tape is in the right place so that we don't overwrite any important footage.
Equipment...
Before we have left for the shooting location, we make sure we have all the correct leads for the cameras.
We also had to bring props, so before arrival, we had to make a checklist to ensure that we don not forgot any props and the shooting is not disrupted.

No comments:

Post a Comment